Skip to main content

Challenge

Many vessels slow‑steam to reduce fuel costs, but operating outside their original design point results in poorer performance – especially for ships with a bulbous bow. This means the full fuel‑saving potential is not achieved.

Solution

Force Technology analysed the vessel’s actual operational profile and developed a new, optimised bulbous bow design. Using parametric hull form optimisation and RANS CFD calculations, the design was tailored to the most common combinations of speed and draught.

Result

The optimised bulbous bow delivers a 11.7% reduction in weighted total resistance, enabling significant fuel savings. The new design is also less sensitive to trim and offers strong retrofit potential for existing vessels.

Related insights